[vc_row][vc_column][vc_column_text css_animation=”top-to-bottom”]Any theater begins with a hanger, and any construction begins with design.

Project documentation is a request of the Customer, presented as diagrams, plans of equipment deployment, specifications and cost estimates, prepared in accordance with the requirements of regulatory documents. But this is not the only advantage.

The project gives the Customer a clear idea of the cost and construction time, allows you to plan your investment schedule minimizing the “shock” of financial investments and the construction schedule of the minimization of process downtime and the consequent financial losses.

Guided by these principles, we provide a full range of works, starting with the pre-project examination and preparation of a technical task to the support of project documentation while passing examinations.

MBS-Engineering has extensive experience in the design and renovation of compressor stations (CS, BCS) as a whole and individual systems:

  • automatic control systems;
  • installations of fuel, pulse and starting gas preparation;
  • installations of gas purification;
  • installations of gas cooling;
  • gas-compressor unit vibration diagnostics systems;
  • CS process control systems etc.

The finished drawing or sketch picture does not always present a complete image of the object, and it is not always possible to visually evaluate the convenience of joining of parts or assemblies.

That is why the development of project documentation is done in 3D-projection systems, which, in addition to a visual representation of the finished installation, allows avoiding errors, inaccuracies and detecting all the errors at the design stage.

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_message]Computer modelling allows considering the appearance of the designed object from any height, angling and location, makes it possible to analyse the behaviour of the mechanism actuator components in the operation, identify all errors and inaccuracies already at the design stage, not in the manufacturing process.[/vc_message][/vc_column][/vc_row][vc_row][vc_column][vc_single_image image=”4960″ img_size=”full” css_animation=”left-to-right” css=”.vc_custom_1478169343902{margin-top: 15px !important;}”][/vc_column][/vc_row]